Applications
dflow apps:rollback
Deploy a previous release without building again.
dflow apps:rollback APP --release RELEASEFlags
--release is required. A release id starts with rel_. --wait defaults to true. --wait-timeout defaults to 5m.
What you see
The deploy operation finishes.
When it fails
A missing --release exits 1 with a release id is required. Pass --release RELEASE.
How is this guide?
Last updated on